In this write-up I will certainly explain the common basic needs of a sound, modern-day high stress, horizontal setup. The following description associates to a modern-day high pressure (400/600Kpa) system commonly made by Kwikot South Africa.

geyser installationgeyser installation


Much less common are old reduced stress systems (100kpa) open pipe or "Latco" type systems. Realize that the components are NOT compatible between both unique systems - High pressure and also Reduced pressure! It is possible to eliminate an old low stress system and change it with a modern high stress system nevertheless - you purchase a new high pressure geyser as well as mount it according to the existing specification.



The exact same regulations apply but there are some special factors to consider described at the end - with a layout. picture kwikot - One of the most evident point that you need to observe right away. The geyser beings in a tray made of plastic (typically red) or tin plate. I like the plastic ones.

Given that June 2001, the drip tray is not optional - its got to exist as well as there needs to be a drain pipe for it! The drain is a 50mm PVC drain that drains pipes the tray by piping the water out your house. I have seen several drip trays set up without drains! If your setup pre-dates June 2001 you may intend to get a plumber to look at it.

Some Known Details About Geyser Installation

The following most recognizable attribute would certainly be the. These are little brass components installed at the end of a 30cm size of pipe. The 2 vacuum breakers stand vertically concerning 30cm over the hot spring. These are important, as they quit water siphoning out the geyser when the chilly supply is stopped.

Keep in mind that vacuum breakers are a reasonably new requirement - there are still thousands of old HP systems out there without vacuum breakers and also I am yet to see one collapse. Simply since I have not seen it does not imply it's not taking place!

The chilly water side is the side that directly attaches to the drain penis as well as enters the geyser near the bottom. After the closed off valve you would typically locate a Stress Control Shutoff (PCV). There are a variety of various types, primarily constructed from brass however some are constructed from plastic.

This is where the PCV releases pressure and this is the pipeline that typically trickles. Don't panic if you can not locate the PCV alongside the hot spring - it may be installed up to 10 metres away, usually in an extra obtainable position on a wall surface exterior. Occasionally it's in a little plastic box outside.

The Ultimate Guide To Geyser Installation

This is an essential element that needs to never be messed with or 'fixed'. This valve ought to have a steel (copper or steel) pipe linked to it and the pipeline have to lead directly out the structure. This vent pipeline is a crucial safety and security attribute of the entire system. It needs to be made from copper or steel - plastic.

The T&P valve is the least optional element - it has to view publisher site be there! - The weight of the geyser should be effectively sustained on the roof trusses - a minimum of 2 assistances under the 'feet' of the hot spring. If it looks shaky get a plumbing technician to examine it out.

This was not a need on old hot springs, but it is now and also it's worth fitting one. The hot spring has to be earthed! I have actually seen numerous geysers with the planet wire inapplicable. All the copper pipelines have to likewise be earthed and adhered to the geyser earth. This is not a trivial precaution! Obtain a qualified electrical expert to inspect your installation if the bonding is missing out on or looks dodgy.


Once again, these are often just left existing following to the geyser. There are basically just two main thermostat kinds - the contemporary round "Kwiktherm" in more recent Kwikot geysers and also the VK (rectangle-shaped block) type in older hot springs and also in some more recent non-Kwikot units. The hot spring might be fed (chilly water) with polcop (plastic) pipe - up to the closed off shutoff, however the pipeline into and out of the hot spring need to be copper or galvanized steel.

9 Simple Techniques For Geyser Installation

geyser installationgeyser installation


The warm water side should be copper, steel or appropriately rated (70) plastic or composite pipeline. Note that you need to have at the very least 1m of copper/steel pipe out the hot spring - you might not attach plastic (composite) pipeline straight to the geyser. As above, the PCV and T&P need to be constructed from copper or steel - specifically the air vent out of the T&P valve.

geyser installationgeyser installation


I have actually seen a variety of installations where the installer has just run a short see page length of 22mm copper right into the drip tray with the suggestion being that the T&P can air vent directly into the drip tray. A concept because the hot (100 +) water/steam thaws the drip tray and the PVC drainpipe pipe.

The PCV is normally over the geyser and also the cold water flows down right into pop over to this site the geyser. This is rather crucial since it develops an anti-syphon loop that stops the geyser from draining back with the inlet in case of a supply of water failure. If you get warm water appearing your cool faucets when the water falls short then this is not working appropriately.